ootouch
Terrasse en bambou installée dans un jardin contemporain

Installation & maintenance

Well installed. Well maintained.

A careful installation reveals the full potential of your ootouch product, and a few simple gestures are enough to preserve its beauty over time.

Installation

Prepare well before you begin.

01

Check the substrate

The substrate must be clean, level, stable and suited to the chosen installation system.

02

Measure the moisture

Check the moisture level of the substrate and the room before any indoor installation.

03

Let it acclimatise

Keep the products in the installation room for at least 48 hours before installing.

Installation

The right gesture, for the right product.

The range

DeckooTouch

Guides dedicated to solid outdoor installations and the iDecking composite system.

Solid cladding

Wall structure, ventilation, fixing and installation of solid cladding boards.

  • Installation according to local standards
  • Ventilated structure essential
Download the PDF guide

iDecking composite terrace

Features, accessories and installation recommendations for the iDecking composite system.

  • Aluminium iDecking joists essential
  • Installation according to local standard
Download the PDF guide

Solid EasyClick decking

Installation of solid boards with the EasyClick clip system, without visible screws.

  • EasyClick clips included
  • Ventilation under the structure mandatory
Download the PDF guide

Installing composite decking

Substrate preparation, joists and fixing of composite decking boards.

  • Respect the joist spacing
  • Plan the water drainage slope
Download the PDF guide

The range

BambooTouch

Solid and semi-solid flooring for residential and professional projects.

Flooring installation guide

Preparation, acclimatisation and installation methods for BambooTouch flooring.

  • Minimum 48 hours acclimatisation
  • Glued or floating installation depending on the product
Download the PDF guide

Bathroom installation

Installation rules, perimeter waterproofing and finish protection in wet rooms.

  • Glued installation mandatory
  • Regular ventilation of the room
Download the PDF guide

Installation on underfloor heating or cooling

Installation conditions and precautions to preserve the flooring’s stability.

  • Surface temperature limited to 27 °C
  • Ambient humidity between 40 and 65%
Download the PDF guide

The range

EcooTouch

BSPC flooring with integrated underlay, designed for floating installation.

BSPC flooring installation

Substrate preparation, perimeter joints and installation steps for the click system.

  • Floating installation only
  • IXPE underlay already integrated
Download the PDF guide

Maintenance

Preserving the material every day.

01

Clean gently

Regularly remove dust and dirt with non-abrasive equipment.

02

Avoid standing water

Use a well wrung-out cloth and quickly absorb any spilled liquids.

03

Nourish the finish

For oiled surfaces, renew the protection with a suitable product when needed.

Maintenance

Good habits, for the long run.

The range

DeckooTouch

Maintenance suited to outdoor exposure and the nature of each board.

Composite decking

Routine cleaning, stain treatment and precautions for composite boards.

  • Clean along the boards
  • Act quickly on stains
Download the PDF guide

Oiled decking & cladding

Cleaning and oiling of outdoor surfaces in partnership with WOCA.

  • Maintenance once or twice a year
  • Apply in dry weather
Download the PDF guide

The range

BambooTouch

Simple gestures to preserve the feel, colour and finish of your flooring.

Maintaining oiled flooring

Initial treatment, regular cleaning, renovation and repair with WOCA products.

  • Do not use microfibre cloths
  • Respect drying times
Download the PDF guide

A technical question?

Your ootouch retailer is here to help.